MIRNEWS.209 15 MARCH 1994 Launch Progress-M22 postponed: This freighter was on schedule to be launched on 16 or 18.03. Due to very bad weatherconditions (blizzards) the launch has been put back for a while. Possibly the exact date of launch will be published on 17.03.94. Fire on Baykonur: On 7.03.94 a heavy fire broke out in a MIK (Assembly and testcomplex) and spread to a Maintenance Unit Headquarters. There the fire damaged a Telemetry installation. The fire caused a damage of appr. 1.7 a 1.8 million dollars. The Russians declared that space-programs will not suffer from this event. Progress-M17: This freighter has been flying autonomously from 11.08.93 for a duration test of its systems. The Russians planned to leave the Pr-M17 in orbit for a year and a half on request by the Americans who want to use modified versions of the Soyuz-TM-ships for ACRV (assured crew return vehicle) for the spacestation Alpha. A testflight with a Pr-M was useful for a lot of systems of this freighter are the same as those of the S-TM. During an orbitmanoeuvre in December 1993 something went wrong and the Pr-M17 came in a very low perigee from where it decayed naturally by burning up in the Earth's atmosphere on 3.03.94 at 0406UTC Trackingships: The trackingship Kosmonavt Pavel Belyayev is floating somewhere in the Atlantic for the support of spaceflight operations which have nothing to do with the MIR-station. Nevertheless the ship now and then assists TsUP for communications with the MIR-station. This took place on 13.03- .94 at 2004UTC and on 14.03.94 at 2045UTC, so out of our range. We can expect that within due time we can hear MIRradiotraffic relayed by the KPB or one of the other ships. Chris v.d. Berg, NL-9165/A-UK3202.