MIRNEWS.259 26 MAY 1995 Schedule for operations in period from 26.05 until 3.06.1995: Redocking of Kristall module from -Y axis to -X axis: In the night from 26 to 27.05.95. Period: from 26.5 2309UTC to 27.05.95 at 0040UTC. (-X axis is forward port transition section, P.Kh.O.) 4th Spacewalk (EVA): This EVA will take place on 28.05.95 from 2240-2310UTC (in Moscow time already 29.05.1995). The cosmonauts will remain inside the vacuumed P.Kh.O. (transitionsection) for the repla cement of the dockingcone from the -X axis to the -Z axis. This for the temporary 'parking' of the Kristall. Redocking of Kristall from the -X axis to the -Z axis on 29.05.1995 from 2200-2330UTC (in Moscowtime already 30.5) The forward dockingport (-X axis) is then free for the recep tion of Spektr. Docking of Spektr is planned for 1.06.1995 at abt 0038UTC. Koppeling van de Spektr aan het MIR-station: The 5th EVA will take place on 2.06.1995, again fully within the P.Kh.O. with a duration of abt. 40 mins. Beginning time thusfar unknown. During this EVA the cosmonauts will replace the dockingcone from the -Z axes to the -Y axes. This to make redocking from Spektr to that port possible. Redocking of Spektr from the -X axes to the -Y axis will take place on 3.06.1995 (times thusfar unknown). When the Kristall will be redocked from the -Z axes to the -X axes is unknown thusfar, but Kristall has to be positioned to that port for the docking of the Atlantis. Chris v.d. Berg, NL-9165/A-UK3202.